![](https://avamonitoring.com/wp-content/uploads/2021/12/Ava_Kundcase_Gotatunneln_500x281.jpg)
Enhanced urban environment with Götatunneln
The 3km long tunnel gave the people of Gothenburg a connection with the water again. Götatunneln was finished 2006 and is one of Gothenburg's largest construction projects. The tunnel reaches all the way from