{"id":478,"date":"2021-12-13T12:34:48","date_gmt":"2021-12-13T12:34:48","guid":{"rendered":"https:\/\/journalio.se\/?p=478"},"modified":"2022-01-27T09:49:19","modified_gmt":"2022-01-27T09:49:19","slug":"kundcase-vartaverket","status":"publish","type":"post","link":"https:\/\/avamonitoring.com\/nb\/kundecase-vartaverket\/","title":{"rendered":"Vibrasjonsm\u00e5ling med 300 m\u00e5lepunkt ved V\u00e4rtaverket"},"content":{"rendered":"<h4 class=\"wp-block-heading\">Fortum tar inga risker n\u00e4r man bygger Sveriges st\u00f6rsta biobr\u00e4nsleeldade kraftv\u00e4rmeverk i centrala Stockholm.<\/h4>\n\n\n\n<p>Att bygga i centrala Stockholm st\u00e4ller alltid h\u00f6ga krav p\u00e5 s\u00e4kerheten. N\u00e4r man bygger t\u00e4tt intill ett kraftverk i full drift hamnar s\u00e4kerhetskraven p\u00e5 en helt ny niv\u00e5.<\/p>\n\n\n\n<p>\u2013 Hele V\u00e4rtaverket er i drift og produserer str\u00f8m og varme i byggetiden, forteller Martin Jonsson, regionssjef ved \u00c5F. S\u00e5 vibrasjonsm\u00e5linger er en viktig del av v\u00e5rt arbeid for \u00e5 sikre forsyning av str\u00f8m til stockholmerne. Et st\u00f8rre kraftbortfall skal bare ikke skje.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Vibrationsk\u00e4nsliga turbiner<\/h3>\n\n\n\n<p>\u00c5F har f\u00e5tt uppdraget att ansvara f\u00f6r all markprojektering, ett arbete som startade 2012. F\u00f6r uppdragsgivaren, Fortum V\u00e4rme AB sam\u00e4gt med Stockholms Stad, \u00e4r anl\u00e4ggningen ett viktigt steg i utvecklingen av en h\u00e5llbar energif\u00f6rs\u00f6rjning, N\u00e4r verket tas i drift 2016 kommer koldioxidutsl\u00e4ppen att minska med ca 650 000 ton per \u00e5r globalt. Men fram till dess kr\u00e4vs ett noggrant s\u00e4kerhetsarbete f\u00f6r att trygga elf\u00f6rs\u00f6rjningen.<\/p>\n\n\n\n<p>\u2013 H\u00e4r finns extremt mycket k\u00e4nslig utrustning som skulle kunna skadas av vibrationer, f\u00f6rklarar Martin Jonsson. Roterande maskiner som turbiner och fl\u00e4ktar, st\u00e4llverk och 100 ton tunga transformatorer. Det har varit en komplicerad process att utreda risker och vibrationsisolera det som skulle kunna skadas.<\/p>\n\n\n\n<p>Ut\u00f6ver det existerande kraftverket finns ocks\u00e5 n\u00e4rliggande bost\u00e4der, kabeltunnlar och viktiga delar av stadens v\u00e4gn\u00e4t att ta h\u00e4nsyn till.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">M\u00e4tning med kort startstr\u00e4cka<\/h3>\n\n\n\n<p>Med m\u00e5nga m\u00e4tpunkter och stora m\u00e4ngder vibrationsdata kr\u00e4vs ett v\u00e4l fungerande m\u00e4tsystem med p\u00e5litlig m\u00e4tutrustning.<\/p>\n\n\n\n<p>\u2013 Vi valde Ava Monitoring eftersom v\u00e5ra m\u00e4tkonsulter k\u00e4nde till deras f\u00e4ltinstrument och har arbetat med det webbaserade m\u00e4tsystemet\u00a0<a href=\"https:\/\/avamonitoring.com\/nb\/avanet\/\" data-type=\"page\" data-id=\"561\">AvaNet<\/a>\u00a0tidigare, s\u00e4ger Martin Jonsson, regionchef p\u00e5 \u00c5F. Det gjorde att vi fick en v\u00e4ldigt kort startstr\u00e4cka. Att alla m\u00e4tdata finns p\u00e5 n\u00e4tet \u00e4r n\u00e5got vi drar nytta av dagligen.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">L\u00e5ng batteritid minimerar arbetet<\/h3>\n\n\n\n<p>I m\u00e4tningarna vid V\u00e4rtaverket anv\u00e4nds ett flertal olika sensorer tillsammans med f\u00e4ltinstrumentet\u00a0<a href=\"https:\/\/avamonitoring.com\/nb\/avatrace-m80\/\" data-type=\"page\" data-id=\"569\">AvaTrace M60<\/a>. Vertikala, horisontella och triaxiella geofoner har liksom accelerometrar placerats ut f\u00f6r registrera data under l\u00e5ng tid.<\/p>\n\n\n\n<p>\u2013 F\u00f6r oss \u00e4r den l\u00e5nga batteritiden en av de allra st\u00f6rsta f\u00f6rdelarna med systemet. Det minimerar v\u00e5rt arbete. Men jag m\u00e5ste ocks\u00e5 n\u00e4mna samarbetet med AVA Monitoring. Vi har haft ett mycket bra samarbetsklimat d\u00e4r vi har f\u00e5tt bra service hela tiden. De \u00e4r aff\u00e4rsm\u00e4ssiga, raka och enkla att arbete med. Och det \u00e4r n\u00e5got jag uppskattar j\u00e4ttemycket, avslutar Martin Jonsson.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<p class=\"responsive-video-wrap clr\"><iframe title=\"Kundcase \u00c5F V\u00e4rtaverket - 300 m\u00e4tpunkter\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/gSf2c33i1OM?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<\/div><\/figure>\n\n\n\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" width=\"240\" height=\"173\" src=\"https:\/\/avamonitoring.com\/wp-content\/uploads\/2021\/12\/bild_Fortum_kraftvarmeverk_dag-1.jpg\" alt=\"\" data-id=\"481\" data-full-url=\"https:\/\/avamonitoring.com\/wp-content\/uploads\/2021\/12\/bild_Fortum_kraftvarmeverk_dag-1.jpg\" data-link=\"https:\/\/avamonitoring.com\/?attachment_id=481\" class=\"wp-image-481\"\/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" width=\"240\" height=\"160\" src=\"https:\/\/avamonitoring.com\/wp-content\/uploads\/2021\/12\/bild_vartaverket-1.jpg\" alt=\"\" data-id=\"482\" data-full-url=\"https:\/\/avamonitoring.com\/wp-content\/uploads\/2021\/12\/bild_vartaverket-1.jpg\" data-link=\"https:\/\/avamonitoring.com\/?attachment_id=482\" class=\"wp-image-482\"\/><\/figure><\/li><\/ul><\/figure>","protected":false},"excerpt":{"rendered":"<p>Fortum tar inga risker n\u00e4r man bygger Sveriges st\u00f6rsta biobr\u00e4nsleeldade kraftv\u00e4rmeverk i centrala Stockholm. Att bygga i centrala Stockholm st\u00e4ller alltid h\u00f6ga krav p\u00e5 s\u00e4kerheten. N\u00e4r man bygger t\u00e4tt intill ett kraftverk i full drift hamnar s\u00e4kerhetskraven p\u00e5 en helt ny niv\u00e5. \u2013 Hela V\u00e4rtaverket \u00e4r i drift och producerar el och v\u00e4rme under byggtiden, [&hellip;]<\/p>","protected":false},"author":2,"featured_media":511,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kundcase","entry","has-media"],"_links":{"self":[{"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/posts\/478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/comments?post=478"}],"version-history":[{"count":3,"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/posts\/478\/revisions"}],"predecessor-version":[{"id":624,"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/posts\/478\/revisions\/624"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/media\/511"}],"wp:attachment":[{"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/media?parent=478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/categories?post=478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/avamonitoring.com\/nb\/wp-json\/wp\/v2\/tags?post=478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}