{"id":478,"date":"2021-12-13T12:34:48","date_gmt":"2021-12-13T12:34:48","guid":{"rendered":"https:\/\/journalio.se\/?p=478"},"modified":"2022-01-27T09:49:19","modified_gmt":"2022-01-27T09:49:19","slug":"kundcase-vartaverket","status":"publish","type":"post","link":"https:\/\/avamonitoring.com\/en\/customer-case-vartaverket\/","title":{"rendered":"Vibration measurement with 300 measurement points at V\u00e4rtaverket"},"content":{"rendered":"<h4 class=\"wp-block-heading\">Fortum takes no risks when building Sweden\u2019s largest biofuel-fired co-generation powerplant in central Stockholm.<\/h4>\n\n\n\n<p>Building in central Stockholm always places high demands on safety. When building right next to a power plant in full operation, the safety requirements reach an entirely new level.<\/p>\n\n\n\n<p>\u201cThe entire V\u00e4rtaverket co-generation plant is in operation, producing electricity and heat during the construction period,\u201d explains Martin Jonsson, Regional Manager at \u00c5F. \u201cSo vibration measurements are an important part of our work for securing the electricity supply for Stockholm residents. A major power outage simply cannot be allowed to happen.\u201d\u201dThe entire V\u00e4rtaverket co-generation powerplant is in operation, producing electricity and heat during construction,\u201d explains Martin Jonsson, Regional Manager at \u00c5F. \u201dSo vibration measurements are an important part of our work for securing the electricity supply for Stockholm residents. A major power outage simply may not happen.\u201d<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Vibration-sensitive turbines<\/h3>\n\n\n\n<p>\u00c5F has been given the assignment to take charge of all land project planning, work which began in 2012. For the client, Fortum V\u00e4rme AB co-owned with the City of Stockholm, the plant is an important step in the development of a sustainable energy supply. When the plant is commissioned in 2016, carbon dioxide emissions will decrease by approximately 650,000 tonnes per year globally. But until then, careful safety work is needed to secure the electricity supply.<\/p>\n\n\n\n<p>\u201dThere is an extreme amount of sensitive equipment here that could be damaged by vibrations,\u201d explains Martin Jonsson. \u201dRotating machines like turbines and fans, distribution substations and 100-tonne transformers. Investigating risks and insulating what could be damaged from vibrations has been a complicated process.<\/p>\n\n\n\n<p>Besides the existing power plant, there are also nearby homes, cable tunnels and important parts of the city\u2019s road network to take into consideration.\u201d<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Measurement with short start-up time<\/h3>\n\n\n\n<p>With many measurement points and large amounts of vibration data, a well-functioning measurement system with reliable measurement equipment is needed.<\/p>\n\n\n\n<p>\u201dWe chose Ava Monitoring since our measurement consultants knew their field instruments and had worked with the\u00a0<a href=\"https:\/\/avamonitoring.com\/en\/avanet\/\" data-type=\"page\" data-id=\"561\">AvaNet<\/a>\u00a0web-based measurement system before,\u201d says Martin Jonsson, Regional Manager at \u00c5F. \u201dThis meant that we had a very short start-up time. We take advantage of all measurement data being online every day.\u201d<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Long battery life minimises the work<\/h3>\n\n\n\n<p>Several different sensors are used together with the\u00a0<a href=\"https:\/\/avamonitoring.com\/en\/avatrace-m80\/\" data-type=\"page\" data-id=\"569\">AvaTrace M60<\/a>. field instrument in the measurements at V\u00e4rtaverket. Vertical, horizontal and triaxial geophones as well as accelerometers have been placed to register data over an extended period of time.<\/p>\n\n\n\n<p>\u201dFor us, the long battery life is one of the largest advantages of the system. It minimises our work. But I also have to mention the cooperation with AVA Monitoring. We have had a very good collaborative climate where we have received good service the entire time. They are professional, straight forward and easy to work with. And this is something I appreciate a great deal,\u201d concludes Martin Jonsson.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<p class=\"responsive-video-wrap clr\"><iframe title=\"Customer Case \u2013 V\u00e4rtaverket\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/gSf2c33i1OM?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<\/div><\/figure>\n\n\n\n<figure class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><ul class=\"blocks-gallery-grid\"><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" width=\"240\" height=\"173\" src=\"https:\/\/avamonitoring.com\/wp-content\/uploads\/2021\/12\/bild_Fortum_kraftvarmeverk_dag-1.jpg\" alt=\"\" data-id=\"481\" data-full-url=\"https:\/\/avamonitoring.com\/wp-content\/uploads\/2021\/12\/bild_Fortum_kraftvarmeverk_dag-1.jpg\" data-link=\"https:\/\/avamonitoring.com\/?attachment_id=481\" class=\"wp-image-481\"\/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img decoding=\"async\" width=\"240\" height=\"160\" src=\"https:\/\/avamonitoring.com\/wp-content\/uploads\/2021\/12\/bild_vartaverket-1.jpg\" alt=\"\" data-id=\"482\" data-full-url=\"https:\/\/avamonitoring.com\/wp-content\/uploads\/2021\/12\/bild_vartaverket-1.jpg\" data-link=\"https:\/\/avamonitoring.com\/?attachment_id=482\" class=\"wp-image-482\"\/><\/figure><\/li><\/ul><\/figure>","protected":false},"excerpt":{"rendered":"<p>Fortum tar inga risker n\u00e4r man bygger Sveriges st\u00f6rsta biobr\u00e4nsleeldade kraftv\u00e4rmeverk i centrala Stockholm. Att bygga i centrala Stockholm st\u00e4ller alltid h\u00f6ga krav p\u00e5 s\u00e4kerheten. N\u00e4r man bygger t\u00e4tt intill ett kraftverk i full drift hamnar s\u00e4kerhetskraven p\u00e5 en helt ny niv\u00e5. \u2013 Hela V\u00e4rtaverket \u00e4r i drift och producerar el och v\u00e4rme under byggtiden, [&hellip;]<\/p>","protected":false},"author":2,"featured_media":511,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kundcase","entry","has-media"],"_links":{"self":[{"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/posts\/478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/comments?post=478"}],"version-history":[{"count":3,"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/posts\/478\/revisions"}],"predecessor-version":[{"id":624,"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/posts\/478\/revisions\/624"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/media\/511"}],"wp:attachment":[{"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/media?parent=478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/categories?post=478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/avamonitoring.com\/en\/wp-json\/wp\/v2\/tags?post=478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}